Modular Build Systems

From the Assembly Hall to a Home on the Pad

OHMS Modular Homes llc coordinates the entire factory-to-site build line: we line the modules in the shop, route every haul with permit flags flying, and lower a finished module onto its waiting pad right on the day the crane is booked. Built by OldcastleFRD for developers and families who want a home set on schedule across the Wasatch Front.

150+
Modules delivered
09
Crane days run
100%
Pads set on schedule
BUILD LINE

The coordinated workshop

A Bay Ledger That Moves a Whole House

Every build at OHMS Modular Homes llc is tracked on a numbered bay ledger, the same way a factory hall keeps its jigs honest. Each row below names one stage of the line, the phase chip it carries the day the module leaves our floor, and the work we do to keep the next pad day exactly on schedule.

MOD-114JIGBay line stage 01

Modular Home Line Planning

We open every project by drawing the build line itself. OldcastleFRD seats the module footprint on a jig and confirms where each wall panel, window and door opens; we confirm that the bay numbers match the haul order so nothing waits for its turn under the crane. Line planning turns a stack of floor plans into a predictable week-on-floor cadence.

Full service detail — line planning

Factory Jig and Bay Scheduling

Each module is built flat on a steel jig, framed square, paneled, wind-sealed and lifted upright only when its pad is ready. We schedule the jig bays so that framing, wiring and finishing crews move shop-to-shop without a single dead day, and we keep a live board of which bay number a module calls home.

Full service detail — jig scheduling
MOD-214JIGBay line stage 02
MOD-314TRANSITBay line stage 03

Transport and Permit Routing

A modular haul is over-dimension and over-weight, and the route has to be honest about it. We file the permits, flag the escort points and map the parkable lane for the day of the move. From the hall gate in Ogden to pads across the Wasatch Front, our haul crew reads the chalk board the way pilots read a flight plan.

Full service detail — transport routing
MOD-414SETBay line stage 04

Foundation and Crane Day Coordination

The pad and the crane close the sale on build time. We verify the concrete is cured to spec, the utility stubs are placed and the crane has firm approach pads on both sides. On crane day the module drops straight to its home, the hook let go on a mark we set earlier that week.

Full service detail — crane day

Utility Connection Planning

A modular home is only finished when water, power, sewer and gas all land at the same utility stub. We draw the connection map ahead of the set so the tie-in crew opens the same trench the pad contractor left open. Sewer slope, panel load and propane pad all get a code so nothing sits unmarked.

Full service detail — utility tie-in
MOD-514UTILITYBay line stage 05
MOD-614INSPECTBay line stage 06

Post-Set Finish and Inspection Systems

After the hook is gone we walk the build with the county inspector, tame the seams, button up the roof valley and close out the punch list for the family. Our finish system logs every seal, every flashing lift and every interior touch so the next owner walks into a house, not a project.

Full service detail — finish and inspection
THE PAD-DAY FLOW
01PermitPaper opened

Haul and set permits filed before the pad is poured.

02HaulRoad day

Module moves under escort with flags and a booked lane.

03CraneLift day

Safety-orange hook drops the module square on its stubs.

04SetSeated

Module lands, leveling jacks set and anchors torqued.

05Tie-InLive home

Utilities landed and the home passes county inspection.

Return lane open — ongoing service on every completed build

HAUL SEASON

What the yard boards read this month

Open Bay Numbers on the Wasatch Line

The haul board below is our live yard chalk. It lists the open pad windows we are booking now for developers and owner-builders along the Wasatch Front. Reserve a slot before the crane is spoken for and your module keeps its place in the bay ledger.

OHMS Modular Homes llc keeps a running set of module arcs that are ready to leave the hall. A typical arc opens a permit window three weeks ahead, books the haul lane for a single morning, and reserves the crane for an afternoon that same week. When a family claims a bay number, the ledger pulls the next module forward into that jig. That is how a whole neighborhood of pads fills at a predictable clip instead of a scramble.

For developers the value is arithmetic: build time that stays on the board beats build time that chases weather. Our same-month pad day means the module you approve at the mill is seated on your pad inside the same calendar month the haul is permitted. Chalk an open bay below and we will walk the pad-day flow with you end to end.

WHY THE HALL

The discipline behind every module

Built Inside, Settled on Time

A modular build is not a lesser house. It is a tighter house, because every trade works at bench height under a roof and every seam is inspected before the haul, not after. The hall gives the build line three advantages a stick-frame crew simply cannot match on a muddy site.

First, weather stops mattering. Framing, wiring, drywall and paint all move forward under a clear roof, which is why a winter month on the Wasatch does not have to stall a pad day. Second, tolerances stay square. A steel jig holds each module dead level, so doors close straight and roof planes meet clean the first time. Third, the schedule becomes a promise. Because crews keep to bay lines with set start and stop marks, the date on the pad board is a commitment we respect.

None of that protects a foundation, though. A module is only as good as the pad under it and the crew that ties it in. That is the reason we schedule the concrete, the crane, the utility trench and the inspection system with the same rigor we give the shop floor. The finished module and the waiting pad meet each other on a day we planned weeks earlier, and the family moves in to a home that is already sealed, level and inspected.

THE COMPANY

Who runs the line

An Integrator for Computer-Integrated Build Systems

OldcastleFRD developed this platform for OHMS Modular Homes llc as a system that knits the assembly hall to the job site the way industrial control software knits a production line together. This is computer-integrated systems design in its most practical form: software that schedules jigs, logs module codes, tracks haul permits and closes out inspection records so every build has one honest ledger.

OHMS Modular Homes llc is headquartered in Ogden, Utah. Our field of work spans the Professional, Scientific and Technical Services sector, and our specialty is computer integrated systems design applied to housing. We do not hurry concrete and we do not rush crane crews; we give every trade a clean, numbered window and hold the date. Families get a move-in day they can schedule around, and developers get a repeatable build line that lowers risk across every pad they plan.

Visit our services to see the full six-stage build line, or reach the office at contact. We would welcome a walk of the hall with your project team before the next haul season board closes.